4381
Cost-Benefit Analysis - Price Calculator
|
Component prices are current as of 05/12/2011.
Number of tenants also
means number of channels (categories, areas), depending on your context. Usually one circuit is
assigned to a channel but they can be combined if same phase. Each phase requires its own channel. Domestic open-wye (120/208)
circuits can be treated as 1-phase for percentage billing purposes if both wires
can fit through the 1/2" CT opening. Two CT's
are needed for dual voltage circuits above 40 amperes.
With the
automatic configuration based on your panel data Standard Schedule or
3-Phase Schedule, the installation will fit like a glove.
Example: Typical mid-sized house might call for these four input values: 250 16 1 1
|
* With standard CT's. |