Home |  Free Tips


3-phase Cost-Benefit Analysis using mMII

mMII Component prices are approximate as of 05/12/2011. Estimate may be revised for a non-Blondel delta with unavailable neutral. With the automatic configuration based on your panel data 3-Phase Schedule, the installation will fit like a glove.



Type in the
average monthly
utility bill
$
Type in the
number of
3-phase circuits
#



  
Estimated
installed
cost per tenant
$
     Estimated
installed
total cost
$
     Estimated
equipment
only price*
$
     R O I
based only on a simple
15% usage cutback
%
     Annual saving
from 15% cutback
by accountable tenants
$
     Annual saving
from not renting individual
utility-owned meters
$
     Annual saving
from demand wholesale rate
instead of residential
$
     Payback time
based on ROI
should
occur in
this many
months

*Three standard CT's per 3-phase circuit.



Review

Includes a fixed charge to cover permanent extended software license and technical support for each order placed, regardless of size.

ADDITIONAL SAVINGS NOT SHOWN ABOVE: The recently passed Emergency Economic Stabilization Act of 2008 (P.L. 110-343) included, extended and/or amended many consumer tax incentives originally introduced in the Energy Policy Act of 2005 (EPACT). The bill also included tax incentives for businesses, utilities, and government. For a complete summary of the tax incentives included in the bill, read the summary of Energy Tax Incentives in The Emergency Economic Stabilization Act of 2008. The bill provides accelerated depreciation for smart electric meters and smart electric grid equipment. The bill allows taxpayers to recover the cost of this property over a 10-year period, unless the property already qualifies pursuant to a shorter recovery schedule.

Warranty information: Processor/PT - Quotation includes specified period for repair or exchange (our option). A proper installation should last 10 years or more. Standard CT's - unlimited replacement if not corroded by saltwater,etc.